✅ 9 criteria passed
❌ 2 criteria to solve
Boost instagantt.com's SEO with Kontactr's Guest Posting.
Secure high-authority, do-follow backlinks from our trusted site—DA44 domain authority and PA55 homepage and blog pages.
Perfect for webmasters seeking higher search rankings and increased organic traffic.
Simple, quick, and effective.
opens a new window
Online Gantt Chart Software | Integrated with Asana | Free Trial
https://instagantt.com
Online Gantt Chart Software to make Project Timelines and Gantt Charts. Manage your schedules, and timelines like a Pro with the best Gantt chart maker. Simple, powe...
https://instagantt.com
Online Gantt Chart Software | Integrated with Asana | Free Trial
Online Gantt Chart Software to make Project Timelines and Gantt Charts. Manage your schedules, and timelines like a Pro with the b...
Great, a redirect is in place to redirect traffic from your non-preferred domain. All versions of your page point to the same URL.
| Attribute | Value |
| ⓘ viewport | width=device-width, initial-scale=1 |
ⓘ The results of our semantic analysis are shown below using the website's language.
They are the main concepts covered by instagantt.com.
Each concept has a confidence score. The higher it is, the more important the topic is relative to the page.
| Topics | |
Gantt chart Confidence: 93%
|
|
Asana (software) Confidence: 87%
|
|
Project management software Confidence: 82%
|
|
Project management Confidence: 74%
|
|
Software Confidence: 73%
|
✅ instagantt.com website speed is fast. Page speed is important for visitors and search engines.
Get insights to improve your page loading time.
This domain loads at the median speed of 3.1 seconds.
instagantt.com is faster than approximately 22 percent of the web. Your website page speed needs to be as fast as you can make it, without compromising the customer experience.
A good goal to achieve is a loading time of 2 seconds on desktop and mobile devices.
ⓘ This website is ranked #85.643 by Alexa.
This rank is traffic based. The lower the rank is, the better the domain is ranked.
| Country | Rank |
Viet Nam |
#33.719 |
India |
#58.179 |
Indonesia |
#55.184 |
Taiwan |
#9.107 |
United States of America |
#55.886 |
Mobile Rendering
This website seems to be optimized for Mobile Visitors.
Phone
Tablet
A good text to HTML ratio is anywhere from 25 to 70%.
This percentage refers to the visible text ratio, as opposed to HTML elements, image tags and other non-visible information.
Great, we found headings on this page.
| Top level heading |
| Online gantt chart software for asana |
| 2nd level heading |
| Manage your project plans like a pro. schedules, tasks, timelines, and workload for your team with the best gantt chart software |
| ınstagantt syncs your gantt charts in two way with asana |
| Simple, powerful, and intuitive website gantt chart. |
| Dependencies made easy |
| Workload management |
| Powerful details |
| Collaborate with your team. share with your clients. |
| Simple gantt charts for everyone |
| 3rd level heading |
| Drag & drop |
| Powerful scheduling |
| Tasks & subtasks |
| Track progress |
| Workload management |
| Change tracking: baselines |
| Collaborate |
| Export |
| Share |
| Free |
| Single user |
| Multiple users |
We found 36 images on this website.
14
ALT attributes are missing on your image tags. The issue affects 10 actual different images that could be loaded more than once in your page.
Alternative text allows you to add a description to an image.
Google rely on alternative text attributes to determine relevance to a search query. Alternative text also makes an image more likely to appear in a Google image search.
It looks like you're missing alternative text for 14 images on instagantt.com. Check your website to make sure it's specified for each image on the page.
For a better readability, only the first 50 internal links are shown below.
| Anchor | Type | URL |
| SIGNINWITHASANA | text | https://app.instagantt.com/asana/connect |
| SIGN IN WITH ASANA | text | https://app.instagantt.com/asana/connect |
| image | https://www.g2.com/products/instagantt/ | |
| @instagantt | text | https://twitter.com/instagantt |
| ⓘ Domain Registrar | NAMECHEAP, INC. |
| ⓘ Registration Date | 04/28/2013 13 years, 5 months, 23 days ago |
| ⓘ Last Modified | 04/29/2019 7 years, 5 months, 23 days ago |
| ⓘ Expiration Date | 04/28/2020 Expired |
| Host | IP Address | Country |
| ns-1441.awsdns-52.org | 205.251.197.161 | United States |
| ns-1631.awsdns-11.co.uk | 205.251.198.95 | United States |
| ns-333.awsdns-41.com | 205.251.193.77 | United States |
| ns-682.awsdns-21.net | 205.251.194.170 | United States |
| Domain |
India (10.0%)
Taiwan (10.8%)
United States of America (26.5%)
ⓘ Responsive website, mobile-friendly.
SOCIAL MEDIA PRESENCE
You're doing quiet good on social media!
Social shares are a key signal, among many others, that search engines use to evaluate the rankings of a website. Asking people to share your pages, adding visible social share buttons and make great quality content are 3 of the most powerful ways to grow your social presence.