✅ 8 criteria passed
❌ 3 criteria to solve
Boost dolphin-emu.org's SEO with Kontactr's Guest Posting.
Secure high-authority, do-follow backlinks from our trusted site—DA44 domain authority and PA55 homepage and blog pages.
Perfect for webmasters seeking higher search rankings and increased organic traffic.
Simple, quick, and effective.
opens a new window
Dolphin Emulator - GameCube/Wii games on PC
https://dolphin-emu.org
Official website of Dolphin, the GameCube and Wii emulator. Download the latest version (5.0-11507) now or ask questions on our forums for help.
https://dolphin-emu.org
Dolphin Emulator - GameCube/Wii games on PC
Official website of Dolphin, the GameCube and Wii emulator. Download the latest version (5.0-11507) now or ask questions on our fo...
| Alternate URL | Hreflang |
| //ast.dolphin-emu.org/ | ast |
| //ms.dolphin-emu.org/ | ms-MY |
| //ca.dolphin-emu.org/ | ca |
| //cs.dolphin-emu.org/ | cs |
| //cy.dolphin-emu.org/ | cy |
| //da.dolphin-emu.org/ | da |
| //de.dolphin-emu.org/ | de |
| //es.dolphin-emu.org/ | es |
| //el.dolphin-emu.org/ | el |
| //fr.dolphin-emu.org/ | fr |
| //gl.dolphin-emu.org/ | gl |
| //it.dolphin-emu.org/ | it |
| //hu.dolphin-emu.org/ | hu |
| //nl.dolphin-emu.org/ | nl |
| //nb.dolphin-emu.org/ | nb |
| //pl.dolphin-emu.org/ | pl |
| //pt.dolphin-emu.org/ | pt |
| //br.dolphin-emu.org/ | pt-BR |
| //ru.dolphin-emu.org/ | ru |
| //sv.dolphin-emu.org/ | sv |
| //tr.dolphin-emu.org/ | tr |
| //cn.dolphin-emu.org/ | zh-CN |
| //ja.dolphin-emu.org/ | ja |
| //ko.dolphin-emu.org/ | ko |
Great, a redirect is in place to redirect traffic from your non-preferred domain. All versions of your page point to the same URL.
| Attribute | Value |
| ⓘ viewport | width=device-width, initial-scale=1.0 |
ⓘ The results of our semantic analysis are shown below using the website's language.
They are the main concepts covered by dolphin-emu.org.
Each concept has a confidence score. The higher it is, the more important the topic is relative to the page.
| Topics | |
Wii Confidence: 90%
|
|
GameCube Confidence: 88%
|
|
Dolphin (emulator) Confidence: 80%
|
|
Video game Confidence: 69%
|
|
Digital distribution Confidence: 69%
|
❌ dolphin-emu.org website speed is slow. Page speed is important for visitors and search engines.
Get insights to improve your page loading time.
This domain loads at the median speed of 1.1 seconds.
dolphin-emu.org is faster than approximately 74 percent of the web. Your website page speed needs to be as fast as you can make it, without compromising the customer experience.
A good goal to achieve is a loading time of 2 seconds on desktop and mobile devices.
ⓘ This website is ranked #29.264 by Alexa.
This rank is traffic based. The lower the rank is, the better the domain is ranked.
| Country | Rank |
India |
#110.335 |
Indonesia |
#41.441 |
Egypt |
#27.025 |
Russian Federation |
#99.048 |
Venezuela (Bolivarian Republic of) |
#6.158 |
United States of America |
#10.724 |
Brazil |
#19.111 |
Canada |
#12.788 |
Canada |
#0 |
Mobile Rendering
This website seems to be optimized for Mobile Visitors.
Phone
Tablet
A good text to HTML ratio is anywhere from 25 to 70%.
This percentage refers to the visible text ratio, as opposed to HTML elements, image tags and other non-visible information.
Great, we found headings on this page.
| Top level heading |
| Dolphin emulator |
| 2nd level heading |
| Latest articles |
| 3rd level heading |
| Dolphin progress report: november 2019 |
| Dolphin progress report: october 2019 |
| Dolphin progress report: august and september 2019 |
| 4th level heading |
| Compatibility » |
| Blog tags |
| Blog series |
We found 24 images on this website.
11
ALT attributes are missing on your image tags.
Alternative text allows you to add a description to an image.
Google rely on alternative text attributes to determine relevance to a search query. Alternative text also makes an image more likely to appear in a Google image search.
It looks like you're missing alternative text for 11 images on dolphin-emu.org. Check your website to make sure it's specified for each image on the page.
For a better readability, only the first 50 internal links are shown below.
| ⓘ Domain Registrar | GANDI SAS |
| ⓘ Registration Date | 07/11/2012 14 years, 3 months, 6 days ago |
| ⓘ Last Modified | 05/19/2019 7 years, 5 months ago |
United States of America (35.0%)
Brazil (4.0%)
Canada (3.6%)
Canada (44.7%)
ⓘ Responsive website, mobile-friendly.
France
SOCIAL MEDIA PRESENCE
You have a relatively high presence on social media, keep going!
The more people share your website, the more likely you will get links from others, which is a key point when it comes to improving your overall search engine rankings.