mobile
Mobile menu

Whois & Analysis for dimsprojects.com

Nov 2, 2024 2:19 pm UTC

DOMAIN OWNER WHOIS

ⓘ The owner's whois contact information is public.
• Contact Name
Dimas D
• Organization
Danawa Indra Mitra Sentosa
• Address
Kelapa Dua 15810
• City
Tangerang
• Zip Code
15810
• State
Banten
• Country
ID
• Phone Number
• Domain Registrar
Desktop screen Desktop screenshot for dimsprojects.com
83

✅ 9 criteria passed
❌ 2 criteria to solve

PERFORMANCE OPPORTUNITIES

Fill the missing alt attributes on your images.
Arrow
Improve your social media presence. Encourage people to share your homepage.
Arrow

OVERVIEW

• Domain Owner
Danawa Indra Mitra Sentosa See more
• Category
Uncategorized
• Online since
January 13, 2023 Explore Wayback Machine
• Age
3 years, 9 months, 6 days

GUEST POST TO SUPERCHARGE YOUR SEO

Guest Posting Rocket

Boost dimsprojects.com's SEO with Kontactr's Guest Posting.

Secure high-authority, do-follow backlinks from our trusted site—DA44 domain authority and PA55 homepage and blog pages.

Perfect for webmasters seeking higher search rankings and increased organic traffic.

Simple, quick, and effective.


opens a new window

TECHNICAL SEO & SECURITY

❌ SSL Certificate
This website is not SSL secured (HTTPS), the certificate issued by Let's Encrypt has expired on December 11, 2024.
✅ Title Tag
CV Danawa Indra Mitra Sentosa Supplier Landscape & Bangunan
Length: 63 (recommended: 10 to 70)
✅ Meta Description
Supplier produk landscape dan bangunan terbaik. Tersedia produk-produk seperti paver, irigasi, batu alam, dan lainnya dengan harga murah.
Length: 137 (recommended: 50 to 160)
ⓘ Google preview
Desktop Version

CV Danawa Indra Mitra Sentosa Supplier Landscape & Bangunan

https://dimsprojects.com

Supplier produk landscape dan bangunan terbaik. Tersedia produk-produk seperti paver, irigasi, batu alam, dan lainnya dengan harga murah.

Mobile Version

https://dimsprojects.com

CV Danawa Indra Mitra Sentosa Supplier Landscape & Bangunan

Supplier produk landscape dan bangunan terbaik. Tersedia produk-produk seperti paver, irigasi, batu alam, dan lainnya dengan harga...

✅ Encoding
Great, language/character encoding is specified: utf-8
✅ URL Resolve

Great, a redirect is in place to redirect traffic from your non-preferred domain. All versions of your page point to the same URL.

✅ URL Parameters
Great, the domain URLs look clean.
Attribute Value
ⓘ viewport width=device-width, initial-scale=1, maximum-scale=1, user-scalable=0
ⓘ robots index, follow, max-image-preview:large, max-snippet:-1, max-video-preview:-1

PAGESPEED INSIGHTS

Page on which speed is tested live:

Chrome User Experience Report Results

Lighthouse Results

Run Google PageSpeed Insights Analysis on dimsprojects.com

LAYOUT

ⓘ Doctype HTML5 Arrow ⓘ Responsive website, mobile-friendly. Arrow

Mobile Rendering

This website seems to be optimized for Mobile Visitors.

Phone
How dimsprojects.com looks like on a mobile device such as an iPhone.

Tablet
How dimsprojects.com looks like on a tablet such as an iPad.

Main colors used

ⓘ These are the main HTML color codes used by this website. Arrow
  • 100% #ffffff
  • 0% #fff0f0
  • 0% #f0ffff
  • 0% #fff0ff
  • 0% #fffff0
  • 0% #ffe0e0
  • 0% #d05050
  • 0% #d0a0a0
  • 0% #f0b0b0
  • 0% #f0e0e0
  • 0% #f0d0d0
  • 0% #e09090

Text/code ratio

ⓘ dimsprojects.com's text/code ratio is 0.84%. It's a bit low. Consider raising it by adding more text content of value for your visitors, or keeping your code clean.
Text / Code Ratio 0.84%

A good text to HTML ratio is anywhere from 25 to 70%.

This percentage refers to the visible text ratio, as opposed to HTML elements, image tags and other non-visible information.

Main HTML tags

✅ Headings Arrow up

Great, we found headings on this page.

  • <H1> 0
  • <H2> 1
  • <H3> 2
  • <H4> 17
  • <H5> 0
  • <H6> 0

However, you have not defined a top level heading, or <H1>. It is used to define the most important heading.

We recommend using one top level heading to set up a semantic relationship between that heading and the remainder of the content on a page. It clearly describes to the readers and the search engines what it is about.

<H2>
2nd level heading
Cv danawa ındra mitra sentosa
<H3>
3rd level heading
Supplıer produk pertamanan dan bangunan
Produk kamı
<H4>
4th level heading
Produk taman dan bangunan
Produk logistik
Menyediakan produk berkualitas tinggi
Memberikan harga menarik
Response cepat terhadap customer
❌ Alt attributes Arrow up

We found 19 images on this website.
10 ALT attributes are missing on your image tags. The issue affects 3 actual different images that could be loaded more than once in your page.

Image Image URL Occurrences
- data:image/svg xml,<svg xmlns=http://www.w3.org/2000/svg viewBox=0 0 1 1/> 7
- data:image/svg xml,<svg xmlns=http://www.w3.org/2000/svg viewBox=0 0 1156 1536/> 2
- data:image/svg xml;base64,PHN2ZyB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciIHdpZHRoPSIxNjQiIGhlaW... 1

Alternative text allows you to add a description to an image.

Google rely on alternative text attributes to determine relevance to a search query. Alternative text also makes an image more likely to appear in a Google image search.

It looks like you're missing alternative text for 10 images on dimsprojects.com. Check your website to make sure it's specified for each image on the page.

SOCIAL MEDIA PRESENCE

❌ This is an overview of your homepage shares on social networks.

It seems you have a very poor social media presence.

Follow these tips to build a better relationship with your audience : set smart goals, identify your audience, be human, seek relationships, create an editorial calendar, automate, focus on helping, optimize for engagement, get visual, stay active and create great content.

  • Facebook iconFacebook
  • Total Engagement 0
  • Likes 0
  • Shares 0
  • Comments 0

DOMAIN REGISTRAR

ⓘ Domain Registrar HOSTINGER OPERATIONS, UAB
ⓘ Registration Date 01/13/2023 3 years, 9 months, 6 days ago
ⓘ Last Modified 01/12/2024 2 years, 9 months, 7 days ago
ⓘ Expiration Date 01/13/2026 Expired
Nameservers Arrow up
Host IP Address Country
ns1.rumahweb.com 198.199.101.34 Flag for United StatesUnited States
ns2.rumahweb.com 139.162.19.83 Flag for SingaporeSingapore
ns3.rumahweb.com - -

SERVER DETAILS

Server map
  • ⓘ Service Provider (ISP)
  • Rumahweb
  • ⓘ IP Address
  • 103.247.8.66
  • ⓘ Country
  • Flag for IndonesiaIndonesia
  • ⓘ Region
  • Jakarta , Jakarta
  • ⓘ Latitude and Longitude
  • -6.2114 : 106.8446
SHARE THIS PAGE